Port of Waterford (Belview)
Follow this place to get notified when material new evidence appears here.
What do you want to check?
What happened
Port of Waterford Company operates the Belview facility on the River Suir estuary in Co. Kilkenny. The reviewed evidence confirms a proposal for an offshore-renewable-energy (ORE) capable terminal - a 250-metre wharf extension with land reclamation - identified as maritime development requiring a Maritime Area Consent (MAC) and an Environmental Impact Assessment Report (EIAR).
1 event on record from 2 source records.
What is connected here
Projects & interventions
- Belview ORE Terminal — 250m wharf extension
Authorisations
- mac · An Coimisiún Pleanála / MARA
What changed
Record added
Waterford Belview ORE terminal application lodged
Port of Waterford lodged a planning application on 9 September 2025 for an offshore-renewable-energy-capable terminal at Belview (250-metre wharf extension with reclamation), requiring a Maritime Area Consent and EIAR.
September 9, 2025
What remains unresolved
No open evidence questions recorded for this place yet.
Latest evidence
- ●
ORE-capable terminal proposed: 250m wharf extension and reclamation
January 1, 2025