Rosslare Europort ORE Hub

In planningOperator: Iarnród ÉireannRegulator: An Coimisiún Pleanála / MARA

Follow this place to get notified when material new evidence appears here.

What do you want to check?

What happened

The Rosslare ORE Hub application was lodged on 10 December 2025, following the grant of Maritime Area Consent MAC20230005 on 2 July 2025. The proposal covers 80.3 hectares, including 48.4 hectares of capital dredging, dredged depths of minus 10 metres Chart Datum for the navigation channel and minus 12 metres for ORE Berth 1, 27.7 hectares of marine reclamation, two heavy-lift berths of 330 metres and 240 metres, a 19.7-hectare ORE storage area, and replacement facilities for the existing small-boat harbour.

3 events on record from 4 source records.

What is connected here

Projects & interventions

  • Rosslare ORE Hub · Not disclosed
  • GREEN DRIFT — Berth 3 upgrade and onshore power supply · ≈ €38.5 million (with Dunkirk; €19.2M CEF)

Authorisations

  • mac · MAC20230005 · MARA

What changed

  • Record added

    Rosslare offshore renewable energy hub application lodged (€220M)

    A planning application for the €220 million Rosslare Europort offshore-renewable-energy hub has been lodged, with a statutory consultation period. This is a material development in the Irish ports clean-maritime pipeline.

    December 10, 2025

What remains unresolved

No open evidence questions recorded for this place yet.

Latest evidence

  • ●

    Statutory consultation period closes

    February 24, 2026

  • ●

    ORE Hub planning application lodged

    December 10, 2025

  • ●

    Maritime Area Consent MAC20230005 granted

    July 2, 2025